New Science Building – Harrogate Grammar School

Harrogate Grammar School

Harrogate, North Yorkshire

Bowman Riley designed a new science building for Harrogate Grammar School, an independent academy trust, with over 1,850 students including over 550 in the Sixth Form.

Science is a key area of the curriculum and the creation of first-class facilities help further students’ enthusiasm for the subject.  The new building replaced a crumbling 1950s science block that was built at a time of austerity to a much lower standard than the original 1930s stone and brick school.

Harrogate Grammar School received £1 million funding from the Education Funding Agency to create the new science facilities.  The funding was received in the April and the new building was needed by September in time for the start of the new academic year.

Bowman Riley proposed a modular building to enable the new facility to be delivered on a fast track basis with erection off-site to minimise disruption to the operations of the school.

The design features a striking entrance and contemporary facade that are juxtaposed between the classically detailed existing building to create a prominent addition to the campus.

The building houses four new laboratories and a preparation room with a new link corridor on the ground floor level to the existing school building to reduce congestion at the busiest area of the school.

View more of our education experience